Samsung Galaxy Unpacked: What to expect and where to watch
The Hindu
Samsung Galaxy Unpacked is set to take place tonight at 11:30 PM IST
Samsung Electronics will host its Galaxy Unpacked event on Wednesday (January 22, 2025), in San Jose, with viewers based in India being able to tune into the livestream at 11:30 PM IST.
The Samsung Galaxy Unpacked event is set to be streamed live on the Samsung Newsroom India, Samsung.com/in, and Samsung’s YouTube channel. Many users are expecting the launch of the Samsung Galaxy S25 series of smartphones, as well as upgraded wearables.
“With One UI 7, Samsung’s first integrated AI platform, the new Galaxy S series is about to set the bar once again for mobile AI experiences now and into the future. The next evolution of Galaxy AI is coming and it’s going to change the way users interact with the world every day,” said Samsung in a press note.
During the Samsung Galaxy Unpacked event in July 2024, the South Korean electronics giant introduced the Samsung Galaxy Z Fold 6 and Z Flip 6 phones, along with the Galaxy Ring, Galaxy Watch 7, Watch Ultra, Buds 3, and Buds 3 Pro.
Generative AI features and mobile AI integrations were a crucial element of the previous launch, and are expected to play a major role this time around as well.

“Earth Day celebrations have already started in Bengaluru, with campaigns at various colleges such as St. Josephs, and Christ University where life-size elephants made from the invasive species, Lantana Camera, have been travelling to spread the message of conservation and coexistence, along with expert talks from WWF India and Ravi Chellam of Metastring Foundation,” said the release.

Vijayawada and Vizag metro rails: Centre approves appointment of SYSTRA MVA Consulting for preparing mobility plans. The New Delhi-based consultant has emerged as the successful bidder for preparing CMPs for both the projects. The Government of Andhra Pradesh has sanctioned DPRs for construction of the Visakhapatnam Metro Rail for a length of 46.23 km in three corridors at an estimated cost of ₹11,498 crore and the Vijayawada Metro Rail for a length of 38.40 km in two corridors at a cost of ₹11,009 crore.