
Water level in Papanasam dam stands at 96.80 feet
The Hindu
he water level in Papanasam Dam on Monday stood at 96.80 feet (maximum level 143 feet). The dam had an inflow of 97.74 cusecs and a discharge of 1,504.75 cusecs. The level in Manimuthar Dam stood at 105.56 feet (maximum level 118 feet). The dam had an inflow of 70 cus
The water level in Papanasam Dam on Monday stood at 96.80 feet (maximum level 143 feet). The dam had an inflow of 97.74 cusecs and a discharge of 1,504.75 cusecs. The level in Manimuthar Dam stood at 105.56 feet (maximum level 118 feet). The dam had an inflow of 70 cusecs and a discharge of 475 cusecs.

The Karnataka government has drafted a comprehensive master plan for the integrated development of Kukke Subrahmanya temple, the State’s highest revenue-generating temple managed by the Hindu Religious Institutions and Charitable Endowments Department. The redevelopment initiative is estimated to cost around ₹254 crore and aims to enhance infrastructure and facilities for devotees.