
Premier League | Chelsea snatch last-gasp win at struggling Palace
The Hindu
Chelsea come from behind to beat Crystal Palace 3-1 with added time goals, moving up to 10th in the standings.
Chelsea came from behind to beat Crystal Palace 3-1 thanks to added time goals from Conor Gallagher and Enzo Fernandez in the Premier League at Selhurst Park on Monday.
Gallagher put the visitors 2-1 up with his second goal of the match before Fernandez sealed the win as Chelsea rallied to secure the points that took them up to 10th in the standings.
The result adds to the pressure on Palace boss Roy Hodgson, whose side have not kept a clean sheet in 13 league matches. They sit 15th on 24 points, five points above the drop zone.
It was a tale of two halves for Chelsea who went into the break a goal down after a superb Jefferson Lerma strike on the half-hour had given the struggling hosts the lead.
"We saw two different sides. In the first half we were so flat and I was so disappointed. In the second half much better and I am very pleased with how we finished the game," Chelsea manager Mauricio Pochettino told the BBC.
Gallagher's first goal against the club where he had a spell on loan in 2021-22 came two minutes after the break as he neatly side-footed Malo Gusto's cross from the right high into the net.
The England midfielder struck again in the 91st, also the product of an attack down the right as he slotted Cole Palmer's cross into the bottom corner from the edge of the area.

The Karnataka government has drafted a comprehensive master plan for the integrated development of Kukke Subrahmanya temple, the State’s highest revenue-generating temple managed by the Hindu Religious Institutions and Charitable Endowments Department. The redevelopment initiative is estimated to cost around ₹254 crore and aims to enhance infrastructure and facilities for devotees.