Mettur level
The Hindu
TIRUCHIThe water level at Mettur dam on Wednesday stood at 120 feet against its full level of 120 feet. The inflow was 15,022 cusecs and the discharge 14,378 cusecs.
TIRUCHI
The water level at Mettur dam on Wednesday stood at 120 feet against its full level of 120 feet. The inflow was 15,022 cusecs and the discharge 14,378 cusecs.
More than 2.6 lakh village and ward volunteers in Andhra Pradesh, once celebrated as the government’s grassroots champions for their crucial role in implementing welfare schemes, are now in a dilemma after learning that their tenure has not been renewed after August 2023 even though they have been paid honoraria till June 2024. Disowned by both YSRCP, which was in power when they were appointed, and the current ruling TDP, which made a poll promise to double their pay, these former volunteers are ruing the day they signed up for the role which they don’t know if even still exists