Waltair Division of East Cost Railway executes safety-related modernisation works
The Hindu
The LHS works were accomplished using heavy machinery, including hydraulic-operated telescopic cranes of 400 tonne, 350-tonne capacity cranes along with 360-tonne and 200-tonne excavators
The Waltair Division of East Coast Railway (ECoR) has executed safety-related modernisation works between Vizianagaram and Srikakulam Road station on the mainline in a single block. A plan of execution was prepared to complete the safety works in a single slot of traffic cum power block. Limited Height Subways (LHS) were constructed between Korukonda-Vizianagaram and Dusi-Ponduru Section by cut and cover method.More Related News