Tirunelveli Reader’s Mail
The Hindu
Expedite work at VOC Stadium, widen bridge, lay walking track, implement UGC recommendation, address GST on postal covers.
Expedite work
VOC Stadium in Palayamkottai was modernised three years ago. Last year, one fourth canopy of the entire gallery collapsed due to heavy rain and wind. New canopy fixing work was started by the Corporation and temporary iron pillars and girders erected more than six months back. But the work has not been executed till date. It is risky for thousands of visitors to the stadium sitting under it. The damaged folding-chairs fixed in the gallery have also to be repaired. Moreover, the main western entrance is totally blocked by parked two- wheelers. There is no parking space even for two-wheelers on Food Court Street behind the stadium. All these things need to be set right at the earliest.
P. Navaraj Chandrasekaran
Tirunelveli
Widen bridge
Vehicles passing through Ozhuhinasery to enter Nagercoil are held up due to bottleneck at the narrow bridge.So, bus passengers are forced to get down midway and walk to reach their destination or to find out alternative conveyance. Solution to this recurrent problem is to widen the bridge or to construct an overbridge. I request the authorities to take immediate steps to implement the feasible scheme at the earliest to end the sufferings of the public.
B. Nagalingam,