
Nod for overbridge project
The Hindu
The Cheranalloor-Eloor-Chauka overbridge has received administrative and technical sanction. The bridge, which will be built at a cost of ₹11.70 crore, will be completed by re-tendering the pending wo
The Cheranalloor-Eloor-Chauka overbridge has received administrative and technical sanction. The bridge, which will be built at a cost of ₹11.70 crore, will be completed by re-tendering the pending work. Land totalling 49.50 acres will be acquired for the purpose in Eloor, Varapuzha and Cheranalloor villages. A sum of ₹5 crore would be set apart to acquire land, a press release said.More Related News