Indrali stretch on Udupi-Manipal highway to be developed from October 1
The Hindu
Traffic diversion will be in place, only for heavy vehicles, till November 14
Udupi Deputy Commissioner M. Kurma Rao said that the pending work of concreting the national highway 169A near Indrali railway overbridge (RoB) on the Malpe-Udupi-Manipal-Agumbe stretch will commence on October 1.
Traffic diversion will be in place, only for heavy vehicles, till November 14, he said on September 29.
An all-weather road will be built on the stretch between Udupi and Manipal.
In a notification issued on September 28, the Deputy Commissioner said that cars, buses and two-wheelers will be allowed to ply on the stretch while work is under way, but heavy vehicles will be diverted through another route.
Heavy vehicles plying from Udupi to Manipal will have to take a left turn at Kalsanka Junction and reach Manipal via Gundibail Road, A.V. Baliga Hospital and Perampalli Road.
Heavy vehicles approaching from Karkala and Hiriyadka to Udupi will have to ply via Manipal-Perampalli-Ambagilu Road.
Cars, buses and two-wheelers plying from Udupi to Manipal will have to take the Indrali bridge in one direction.
The girl, who was admitted to Aster CMI Hospital with alarming breathlessness and significant pallor, was diagnosed with Wegener’s Granulomatosis (now known as Granulomatosis with Polyangiitis or GPA), a rare autoimmune condition that causes spontaneous bleeding in the lungs, leading to acute respiratory failure.
ACB files case against IPS officer N. Sanjay in Andhra Pradesh. The official is accused of manipulating the tender processes for awarding contract for development and maintenance of AGNI-NOC portal, and conducting awareness meetings for SC/STs. It is alleged that the total value of properties stolen, or involved in the case is estimated at ₹1,75,86,600.