
Desilting works inspected
The Hindu
THANJAVUR Monitoring Officer Pradeep Yadav on Tuesday inspected the desilting of irrigation channels, drains and other waterways took up at a cost of ₹ 20.50 crore in Thanjavur district.Under the sche
THANJAVUR Monitoring Officer Pradeep Yadav on Tuesday inspected the desilting of irrigation channels, drains and other waterways took up at a cost of ₹ 20.50 crore in Thanjavur district. Under the scheme, channels and drains for a length of 1169 kilometres would be desilted and the works are expected to be completed in about 10 to 12 days well before release of water for irrigation from Mettur dam, Mr. Yadav told reporters at Thanjavur.More Related News