Primary Country (Mandatory)

United States

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
English
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
English
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
CNN
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
AajTak
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
Trendy Racerback Tank Tops Buy Now
Men's V-Neck Sweater Buy Now
Gold Pearl Bridal Jewelry Set Buy Now
Sunzel Flare Leggings Buy Now
Women's Summer Tops Buy Now
Men's 2 Pack Slim Fit T-Shirts Buy Now
SHEWIN Womens Fashion Oversized T Shirts Buy Now
Banarasi Silk Saree Buy Now
COOFANDY Men's Wrinkle-Free Dress Shirt Buy Now
Comfort Flex Waist Jean Buy Now
LN LENQIN Military Sport Watch Buy Now
Comfort Flex Waist Relaxed Fit Jean Buy Now
Crocs Classic Clogs Buy Now
Blazer Casual Sport Coats Buy Now
Georgette Silk Saree Buy Now
Slim Fit Ripped Skinny Jeans Buy Now
Satin Silk Pajama Set for Women Buy Now
Weatherproof Vintage Men's Jeans Buy Now
Acer Aspire C27-1700-UA91 AIO Desktop Buy Now
Essentials Womens Fleece Short Buy Now
MoreBack to News Headlines
443 Infrastructure Projects Show Cost Overruns Of Rs 4.45 Lakh Crore: Report

443 Infrastructure Projects Show Cost Overruns Of Rs 4.45 Lakh Crore: Report

NDTV
Sunday, February 27, 2022 8:58 AM GMT

"Total original cost of implementation of the 1671 projects was Rs 22,54,175.77 crore and their anticipated completion cost is likely to be Rs 26,99,651.62 crore, which reflects overall cost overruns of Rs 4,45,475.85 crore (19.76% of original cost)," Ministry of Statistics' latest report said.

As many as 443 infrastructure projects, each entailing investment of Rs 150 crore or more, have been hit by cost overruns totalling more than Rs 4.45 lakh crore, according to a government report.

The Ministry of Statistics and Programme Implementation monitors infrastructure projects of Rs 150 crore and above.

Of 1,671 such projects, 443 projects reported cost overruns and 514 projects were delayed, reported news agency PTI.

"Total original cost of implementation of the 1671 projects was Rs 22,54,175.77 crore and their anticipated completion cost is likely to be Rs 26,99,651.62 crore, which reflects overall cost overruns of Rs 4,45,475.85 crore (19.76% of original cost)," the ministry's latest report for January 2022 said, according to Press Trust of India.

Read full story on NDTV
Share this story on:-
Run 3 Space | Play Space Running GamePlay Run 3, the ultimate space tunnel running game with 300+ challenging levels!Adv.
Traffic Jam 3D | Online Racing GameTraffic Jam 3D is a game where you’ll be driving through heavy traffic.Adv.
Duck Hunt | Play Old Classic GamePlay the classic 1984 light gun shooter game Duck Hunt on your browser.Adv.
More Related News
Parking Slot | Free Parking GamePlay Parking Slot, the best online 3D car driving and parking game.Adv.
Slope Ball Run - Play OnlineSlope Game takes you on an exciting journey of a ball on special paths.Adv.
© 2008 - 2025 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us